Project Overview
This Boston deck had a critical structural flaw: the joists had separated from the beam and was beginning to sag. After consulting with an engineer, we removed the compromised beam and installed a new beam with tension ties to prevent future splitting, restoring both structural integrity and safety.
The separation of joists from the beam is a serious structural issue that can lead to deck collapse if not addressed promptly. Our team recognized the severity of the situation and immediately brought in a structural engineer to develop a comprehensive repair solution.
The engineered solution included the installation of tension ties—specialized hardware designed to keep the beam and joists properly connected under load. This prevents the type of splitting and separation that caused the original failure, ensuring the deck will remain safe and stable for years to come.
Scope of Work
Engineered structural beam replacement:
- Structural assessment and engineering consultation
- Temporary support installation for safety
- Removal of compromised beam
- Installation of new engineered beam
- Tension tie installation to prevent splitting
- Joist-to-beam reconnection
- Structural integrity verification
- Final safety inspection